Monday, May 12, 2008

4th and 5th Week of Reno - 28 April-11 May 2008

It took 2 weeks for the wall between the bedroom and living room to be hacked. This is because the permit, although approved, took time to reach the ID. It was a long wait but after seeing the result after hacking, we are impressed and happy. The living room is brighter and very spacious now.


These materials should be for false ceiling.

No comments: