Besides the platform was done during this week, the bedrooms parquet was polished FOC. Now they look shiny. The floor where the wall was hacked looks the same as the rest of the room. Acid-wash of the entire house was done too. This is the 1st time since we've got our keys in Feb that we can walk around without shoes on.


Parquet - Well polished for all bedrooms. Shown here is the studyroom. The boundary between the studyroom and living room is well-defined. Nicely done! Now waiting for the glass panels and doors to be fixed next week.


Acid-washed floor - After we went into the house, tears start to well-up. Not because we're sad or touched by the reno done, but due to some chemicals present in the air after the wash. :~


A closer look at the kitchen sink. It's undermount and I simply love it!

By next week, all reno should be completed. The headboard, side and dressing tables will be up. Glass doors and mirrors will be installed. The things that we bought ourselves will also be fixed. After that we'll have a good check on the house and report any unsatisfaction to Miko.