Headboard is finally up, though not yet completed. :) We're very delighted with the results. We simply love the design on the laminate. Workmanship is good too. Hope that with the cushions in place, it'll look even more magnificent. Our tea-coloured mirrors and glass panals are mostly in place. Only a few pieces were not measured correctly and were taken back. The items we've bought were also installed. There are a few things left that need to be touch up and redo. We're planning to ask Miko to help us redo the living room grout as it's uneven and dirty. This will be an additional cost of about $300+.


Headboard - Cushions and the dressing table's mirror are not installed yet, but it looks very nice already. The pattern on the laminate is so nice. We love it!


Walk-in-wardrobe - The mirror and the glass shelf are in place.

Tea-coloured mirrors - Finally they're here. Our tv console and feature wall look so much nicer and complete now. It'll look even better with the warm lights on.


Glass wall - Taken from the study room. Not completely done yet, but it still looks good.


Kitchen glass door and our Fisher & Paykel washing machine are installed.


The 2 railings bought from Ikea and our 30L Ariston storage heater are fixed up.


Glass shelves and storage cabinets, both from Ikea, are installed too.


Black laminate at the shoe cabinet is poorly done. Under reflection, the laminate looks very uneven, with many dents and is not smooth. Talked to Miko about it and she also agrees with us and said they'll replace the doors.